Community and Venues
Design/Build Projects
SH-130 Segments 1-4 SH-130 Segments 1-4

Austin, TX

Equity partner in Lone Star Infrastructures, a JV with Balfour Beatty Infrastructure and Fluor created to execute 1.3 billion dollars of construction; one of the largest design-build road contracts in the US at the time. Earthmoving operations peaked at 2.2 million cu yds per month on this highly accelerated, closely coordinated project.

SH 130 Segments 5-6 SH-130 Segments 5-6

Travis/Caldwell Counties, Lockhart, TX

Earthwork to support 28 miles of new divided highway. Includes clearing, topsoil stripping, mass excavation of 10 million cu yds of material, placing 6 million cu yds of embankment, performing 2.5 million sq yds of lime stabilization treatment at depths from 12" to 42", 670,000 tons of stone flexbase, seeding.

I-69 Design/Build Segments 10-11 I-69 Design/Build Segments 10-11

Daviess County, IN

Managing partner of construction of 8 miles of new highway including 15 bridges, 1 interchange and over 2.0 million cubic yards of earthmoving.