SH-130 Segments 1-4
Austin, TX
Equity partner in Lone Star Infrastructures, a JV with Balfour Beatty Infrastructure and Fluor created to execute 1.3 billion dollars of construction; one of the largest design-build road contracts in the US at the time. Earthmoving operations peaked at 2.2 million cu yds per month on this highly accelerated, closely coordinated project.
Travis/Caldwell Counties, Lockhart, TX
Earthwork to support 28 miles of new divided highway. Includes clearing, topsoil stripping, mass excavation of 10 million cu yds of material, placing 6 million cu yds of embankment, performing 2.5 million sq yds of lime stabilization treatment at depths from 12" to 42", 670,000 tons of stone flexbase, seeding.
Daviess County, IN
Managing partner of construction of 8 miles of new highway including 15 bridges, 1 interchange and over 2.0 million cubic yards of earthmoving.