Dallas Floodway Extension
Dallas, TX
Realignment of the Trinity River – Active Floodway including 925,000 cy unclassified excavation, 345,000 cy rock excavation, 850,000 cy fill, 800,000 cy landfill material removal, 85,000 sf cut off wall. Also, 350,000 cy of export and 78,000 cy of sludge removal...
US Army Corp of Engineers | Grand Prairie, TX
Channel improvements including 200,000 cu yds of excavation, 56,000 tons of gabion protection system, storm drains and sanitary systems.
Tulsa, OK
Mainstream channel and detention site – construction for capacity increase of temporary detention pond, including levee, concrete inlet weir and outlet conduit with flap gate. Storm detention facility for flood prevention including 1,300,000 cu yds of excavation, 1,500 cu yds of concrete...
Dallas, TX
Project consisted of dredging and widening the Five Mile Creek Channel, excavating a bench adjacent to the channel, placing fill on the levees, desilting Crow Lake and other miscellaneous items necessary. Included approximately 700,000 cubic yards of excavation and riprap placement...
Central Wastewater Treatment Plant
Dallas, TX
Levee improvements for flood control. 300,000 cu yds of embankment, storm drains and miscellaneous improvements. Approximately 350,000 cu yds of levee embankment for flood improvements and clarifier rehabilitation...
Indian Creek Reservoir/Channel Improvements - Phase I
Aurora, IL
Flood Retention – 650,000 cu yds of excavation, concrete structures, piping...
Middlefield Road Levee Flood Protection
Dallas, TX
Project A – including slurry trench construction, mitigation, weir structures, embankment and related work...