AUI Prime, LLC | Hutchins, TX
Construction of Intermodal Terminal for UP on 300 acre site including 2 million cubic yards of excavation, almost 100,000 lf of track, and 10,000 lf water main, sanitary sewer and storm drain lines. One of the fastest mandated projects in the DFW Metroplex at the time, TJL managed the schedule...
BNSF | Elwood, IL
4-1/2 miles of grading, embankment, 3 bridges, subballast, culverts, landscaping, erosion and sediment control. This work was completed adjacent to existing high speed track with an average of 160 movements per day as well as wetland areas...
BNSF Centerpoint Properties | Elwood, IL
Development of 2,000 acre site including a 100 acre rail yard and 400 acres of warehousing. Work included 8 million cys of excavation, application of stone, subballast, 3 bridges,2-1/2 miles of rail siding and spur track installation. Also, appx. 5,400 lf of underdrain at container care yard...
City of Chicago/O’Hare International Airport | Chicago, IL
Railroad relocation and construction of access road including unclassified excavation, structures, underground, as part of OMP (O’Hare Modernization Program). Construction of (2) new 2 mile track mains, a portion of which traversing an official waterway of the US. (2) box culvert structures...
CSX | Chicago, IL
Demolition and removal of contaminated yard for new intermodal facility, appx. 400,000 cyds excavation, 340,000 tons of stone bases, 247,000 sf of geo-grid...
Midlothian Development Authority | Midlothian, TX
Construction of onsite railspur loop with side tracks and switching yard for UP and BNSF including 1.5 million cubic yards of excavation, also underground utilities and bridges, miscellaneous concrete structures, underground utilities, subballast. The 6 miles of trackwork included tie in operations to existing rail spur...